General Contractors · 9 min read

LADBS express permits: which LA jobs skip plan check

Which jobs LADBS issues as express permits with no plan check, whose name goes on them, where the City line ends, and how LA contractors turn that into pages.

No plan check.

An LADBS express permit is a City of Los Angeles permit issued without plan review, one that can be issued the same day. Two of every three LADBS permits in 2025 were express: re-roofs, same-size window swaps, water heaters, HVAC change-outs, kitchens and baths with no structural changes. Change the structure, add a unit or rebuild after the fire, and it’s plan check. For a Los Angeles contractor, that line shapes quotes and websites.

Reviewed on November 18, 2026. Read for this post: LADBS’s permit records on the City’s open data portal (counted by LocalBiz, permits issued through November 14, 2026), CSLB’s owner-builder guidance, LA County Public Works, Pasadena’s Permit Center and the City’s Office of Finance. Other cities in the county were not checked. LADBS revises its express list, so check its current list before you quote a scope that isn’t shown here. This is what the records say, not legal advice.

What an LADBS express permit covers

LADBS sorts every permit into one of two lanes. Its own permit data says a no-plan-check permit “may be issued the same day”, while a plan check permit waits for a plan checker to review the drawings.

Across building, electrical and mechanical permits, LADBS issued 160,656 permits in 2025, and 107,107 of them were express. The share differs by trade: 84.9% of electrical permits and 83.1% of mechanical permits went express, against 39.8% of building permits. Mechanical express permits included 19,197 for plumbing and 12,480 for HVAC, and 4,357 of them mention a water heater.

Building permits are where a general contractor’s scopes sit, and LADBS prints standard wording on them. These are the phrases on 2025 express building permits (one permit can carry several):

Scope, in LADBS’s wording 2025 express permits
Re-roof with Class A or B material under 6 pounds per sq. ft. 11,827
Bathroom remodel, residential, no structural changes 2,767
Sill plate anchor bolts and cripple wall plywood per LA City Standard Plan #1 2,037
Window and door change-out, same size and type 1,755
Kitchen remodel, residential, no structural changes 1,371
Replace drywall, no new walls, single family and duplexes only 684
Water, termite or dry rot repair under 10% of replacement cost 590
Freestanding block fence walls up to 6 feet, residential zones 457
Finishing work under an expired permit 446

Source: LocalBiz count of LADBS permit records, November 2026.

Where plan check starts, and how long it ran

The qualifiers in that table are the line: “no structural changes”, “same size and type”, “no new walls”. A kitchen that keeps its walls and structure fits the express wording. Take out a bearing wall and it no longer does. Enlarge a window opening and it stops being “same size and type”.

LADBS records three plan check lanes. Here is how long 2025 building permits took from submittal to issue:

Lane 2025 building permits Median days, submittal to issue
Express Permit 25,234 No plan review; no submittal date recorded
Plan Check at Counter 15,171 11
Expanded Counter Plan Check 9,460 72
Regular Plan Check 13,477 161

Source: LocalBiz count of LADBS permit records, November 2026. The days include the time applicants spent on corrections, so they are not LADBS’s review time alone.

That changes the estimate conversation. A homeowner choosing between a kitchen that keeps its structure and one that removes a bearing wall is choosing between a permit that can come the same day and a wait that ran a median 72 or 161 days in 2025, before any work starts. Our advice: name the lane in the written estimate, so the homeowner hears it from you before a second bidder says it.

Whose name goes on the permit

California’s contractor board is blunt about it. CSLB’s owner-builder pamphlet says anyone who bids a project of $1,000 or more must be licensed, and that “any project needing a permit or workers requires a licensed contractor.”

A homeowner can sign as owner-builder, under conditions: for a home improvement, the home must be their principal residence, lived in for the 12 months before the work is finished. CSLB says the owner who signs “assumes full responsibility for all phases” of the project. It also warns about homeowners who hire unlicensed people and misrepresent on the permit application that they will do the work themselves.

LADBS’s records show who holds each permit. 2025 records include supplemental permits that transfer a permit to a contractor by license number, and others that change the contractor to “owner-builder”. LADBS’s older public permit data (2013 to May 2023) had fields for the contractor’s business name and license number on each permit.

Our advice: when you do the work, pull the express permit under your own license, and say so on the page for that job. CSLB also requires your license number in all advertising, which our California license number guide covers in full.

The City line, and the permit desks past it

LADBS issues permits for the City of Los Angeles only. “LA” on a lead form can mean a job it doesn’t cover:

  • Unincorporated LA County. Public Works Building and Safety runs permits and inspections through EPIC-LA. Its express permits cover “simple mechanical, electrical, plumbing, sewer permits” and residential solar roof mounts up to 38.4 kW AC.
  • Pasadena. Mechanical, electrical and plumbing permits come “within minutes” from its Express Permit Portal, and Pasadena requires a business license for “all contractors” pulling permits.
  • Other cities. Some run their own permit office and some contract with the County, which takes their applications on a separate system (BSOP). We didn’t check the others for this post.

The City has its own tax registration too. The Office of Finance says every person doing business in the City must hold a Business Tax Registration Certificate. Contractors are taxed under LAMC Section 21.188, with a minimum of $153 a year, and a business based outside the City still owes it on City work.

So a town page should name the office that will issue the permit. Our LA electrician post shows how that table works for town pages.

Palisades rebuilds and ADUs are plan check work

The Palisades Fire started on January 7, 2025, and destroyed 6,845 structures, according to CAL FIRE. LADBS’s records show the rebuild. New-building permits in ZIP 90272, Pacific Palisades, went from 42 in 2024 to 642 in 2025 and 1,089 from January 1 to November 14, 2026. In 2025, 1,146 of that ZIP’s permits went through Regular Plan Check, against 447 express. The County has run its own Palisades rebuild workshops from its Calabasas office for the unincorporated side.

ADUs follow the same lane. LADBS issued 6,556 permits in 2025 that added 7,307 accessory dwelling units, and 3 of those permits were express.

These jobs sell differently from a re-roof. The homeowner is hiring someone to carry a project through months of plan check with a designer or engineer, not to show up next week. A rebuild or ADU page should say how you handle that: who draws the plans, who answers corrections, and what you do while the permit is in review.

Turning the two lanes into pages that win the job

Searches made from Los Angeles show how much is at stake: “general contractor” draws about 5,400 a month, “general contractor near me” 2,400 and “kitchen remodel” 1,900. Advertisers pay an estimated $48.38 for one click on “remodeling contractor”. On Google Maps, 19 of the top 20 results for “general contractor” link a website, so having a site doesn’t set you apart. In our view, pages that answer the permit question can. (LocalBiz analysis of DataForSEO data, November 2026.)

Express-lane pages. One page per scope you sell, each saying what LADBS’s wording requires:

  • Re-roofs. LADBS’s re-roof wording requires a Class A roof covering in a Very High Fire Hazard Severity Zone, and a certified cool roof product when more than half of a residential roof is replaced. Say which neighborhoods you work in that fall in a fire zone.
  • Kitchens and baths without moving walls. Say plainly that this is the same-day permit, and what moves a job into plan check.
  • Window and door change-outs. LADBS’s wording requires dual glazing certified by the National Fenestration Rating Council on replacements in residential buildings of three stories or less.
  • Seismic bolting to Standard Plan #1. LADBS put this scope on 2,037 express permits in 2025, so it deserves its own page.

Plan check pages. Additions, ADUs, fire rebuilds and any kitchen that opens a wall. These pages explain the wait instead of promising speed.

For the rest of the plan, from referrals to the signed bid, see our contractor marketing guide.

Your permit record as proof

Homeowners and agents look permits up. “ladbs permit search” draws about 4,400 US searches a month and “ladbs permit status” 3,600 (LocalBiz analysis of DataForSEO data, November 2026). What they find is a status. Of the express building permits LADBS issued in 2025, 18,404 (72.9%) showed “Permit Finaled” by mid-November 2026.

That status is the proof a project page can carry. Our advice: with the client’s agreement, list the neighborhood, the scope, the permit lane and “permit finaled” under the photos, and leave the street address off. A page full of finaled express jobs in Highland Park or Sherman Oaks reads as work that passed inspection, which a homeowner can check.

The LocalBiz approach

LocalBiz doesn’t pull permits, look up permit records or file anything with LADBS. It builds your website with a page for each service you sell and for each service in each town you serve, written from the services and details you give it (what it builds for general contractors). The CSLB license you enter in Settings → Content → Local trust goes into the writing and the structured data; you supply the number and LocalBiz never invents one. Every page carries a quote form, and each request is emailed to you and saved in your dashboard.

Start with the three scopes you pull most often and give each one a page, then add the plan check work you want more of. If you’d rather have those pages built and written for you, see LocalBiz’s plans.

Frequently asked questions

What is an LADBS express permit?

It is a City of Los Angeles building, electrical or mechanical permit issued without a plan review. LADBS’s permit data says such a permit “may be issued the same day”. Typical scopes are re-roofs, window and door change-outs of the same size and type, and kitchen or bath remodels with no structural changes. In 2025, 107,107 of LADBS’s 160,656 permits were express.

Does a kitchen remodel need plan check in Los Angeles?

Not when it changes no structure. LADBS issued 1,371 express permits in 2025 worded “Kitchen remodel for residential buildings (no structural changes)”, and that wording appears on no plan check permit that year. Remove a bearing wall and the job no longer fits that wording. Regular plan check took a median 161 days from submittal to issue in 2025.

Can a homeowner pull the permit instead of the contractor?

California allows owner-builder permits under conditions, such as living in the home for 12 months before the work is finished. CSLB warns that the owner who signs as owner-builder “assumes full responsibility” for the project, and that “any project needing a permit or workers requires a licensed contractor.” If you are doing the work, pull the permit under your own license.

Does LADBS issue permits for Pasadena or unincorporated LA County?

No. LADBS covers the City of Los Angeles only. Unincorporated areas go through LA County Public Works and its EPIC-LA system, which issues express permits for simple mechanical, electrical, plumbing, sewer and small solar jobs. Pasadena runs its own Express Permit Portal and requires a city business license for contractors pulling permits.

Sources

  1. City of Los Angeles open data — Building and Safety, Building Permits Issued from 2020 to Present (LADBS)
  2. City of Los Angeles open data — Building and Safety, Electrical Permits Issued from 2020 to Present (LADBS)
  3. City of Los Angeles open data — Building and Safety, Mechanical Permits Issued from 2020 to Present (LADBS)
  4. City of Los Angeles open data — LADBS-Permits (2013 to May 2023, with contractor and license fields)
  5. Contractors State License Board — Owner-Builders Beware! Know Your Responsibilities as an Owner-Builder
  6. Contractors State License Board — Owner-Builder Overview for building officials
  7. LA County Public Works — Building and Safety (EPIC-LA, express permits, fire rebuilding)
  8. City of Pasadena — Permit Center Online
  9. City of Los Angeles Office of Finance — Business Tax Information FAQ
  10. CAL FIRE — Palisades Fire incident
  11. LocalBiz analysis of DataForSEO data, November 2026 (Los Angeles searches and Google Maps results for "general contractor"; US searches for LADBS terms)
More for general contractorsWhat your customers search, what it costs to advertise, and the website LocalBiz builds for you →

Want a page for each permitted job in each town you work?

Build your free website →
LADBS express permits: which LA jobs skip plan check